The purpose of the Spill Prevention, Control, and Countermeasure (SPCC) rule is to help facilities prevent a discharge of oil into navigable waters or adjoining shorelines. The SPCC rule requires facilities to develop, maintain, and implement an oil spill prevention plan, called an SPCC Plan.
What types of oil are covered in the SPCC plan?
Oil of any type and in any form is covered, including, but not limited to: petroleum; fuel oil; sludge; oil refuse; oil mixed with wastes other than dredged spoil; fats, oils or greases of animal, fish, or marine mammal origin; vegetable oils, including oil from seeds, nuts, fruits, or kernels; and other oils and …
How long are SPCC plans good for?
five years
You must review your Plan every five years to include any changes in oil storage or spill prevention procedures or equipment at your facility.
What is considered oil under SPCC regulations?
Under the SPCC rule (40 CFR 112.2), “Oil means oil of any kind or in any form, including, but not limited to: fats, oils, or greases of animal, fish, or marine mammal origin; vegetable oils, including oils from seeds, nuts, fruits, or kernels; and, other oils and greases, including petroleum, fuel oil, sludge.
What is a PPC plan?
The objective of the PPC Plan is to reduce the potential impact of spills, releases, accidents and other emergencies on public health, occupational safety and the environment. If the plan fails in an emergency, the plan will be reviewed and revised to meet the facility’s needs.
What is the goal of the SPCC plan?
The purpose of the Spill Prevention, Control, and Countermeasure (SPCC) rule is to help facilities and farms prevent a discharge of oil into navigable waters or adjoining shorelines. The SPCC rule requires farms and other facilities to develop, maintain, and implement an oil spill prevention plan, called an SPCC Plan.
How often does an SPCC plan need to be reviewed?
every five years
You must review your Plan every five years to include any changes in oil storage or spill prevention procedures or equipment at your facility. Do state engineering requirements impact SPCC Plan self-certification? Some states require a PE to perform certain functions, including certifying SPCC Plans.
Which of the following are the three response planning levels a facility must prepare for?
Response Planning Scenarios. EPA retained the requirement to plan for three specific scenarios for oil discharges: small (2,100 gallons or less), medium (between 2,100 and 36,000 gallons, or 10 percent of the worst case discharge, whichever is less), and worst case.
What is the purpose of the SPCC?
The purpose of the Spill Prevention, Control, and Countermeasure (SPCC) rule is to help facilities prevent a discharge of oil into navigable waters or adjoining shorelines.
What is the SPCC rule for above ground oil storage?
A facility is covered by the SPCC rule if it has an aggregate aboveground oil storage capacity greater than 1,320 U.S. gallons or a completely buried storage capacity greater than 42,000 U.S. gallons and there is a reasonable expectation of an oil discharge into or upon navigable waters of the U.S. or adjoining shorelines. 2.
What is the SPCC rule for the production sector?
SPCC Rule: Train-the-Trainer for the Production Sector provides organizations with materials to hold trainings to raise awareness of the SPCC rule. Tier I Template, is intended to help the owner or operator of a Tier I qualified facility develop a self-certified SPCC Plan. See also: Is My Facility a “Qualified Facility” under the SPCC Rule?
Why are there different SPCC plan templates for different facilities?
Each completed Plan template is intended as a model to show how the template could be completed. Each facility owner or operator has the flexibility to tailor the SPCC Plan to site-specific circumstances. Therefore, each example Plan is unique for the fictional scenario and cannot be adopted by the owner or operator of an actual facility.